الاثنين، 30 مارس 2009

RESUME OF
ENGINEER BELAL MERDASH MOHAMED AHMED

I. PERSONNAL INFORMATION:
FULL NAME: BELAL MERDASH MOHAMED AHMED
MAIL ADRESS: kafr kandeel, Atfeh, Giza- post no. 12956
BIRTH DATE: 12/29/1980
MARITAL STATUS: MARRIED
NATIONALITY: Egyptian
CONTACTS NUMERS:
MOBILE 0020103850099
HOME PHONE 0020238414232 - 0020238411520
Email address BELALMERDASH@YAHOO.COM

II. EDUCATIONAL ACHIEVEMENTS:
A-COLLEGE STUDY:
DEGREE: B. Sc.EE
NAME AND ADREES OF THE UNIVERSUTY: Helwan, Cairo, Egypt
START DATE: Sep, 1998
GRADUATION DATE: May, 2003
Graduation Grade : - Good
Senior project
Title : - PLC system applications
Subject : - Power Factor Correction.
Main Object:-Study in details the following items…
1-Study PLC 4Hitachi
2-Study the sources for reactive power
3-Study the bad effect of decreasing power factor
Grade :-Excellent

B-SECONDRY SCHOOL STUDY:
HIGH SCHOOL DEGREE: THANAWIA AMMA from Atfeh Elthanawia School
GRADE : 93 %

III. TRAINING AND DEVELOPMENTS:
A-OFF -SHORE TRAINING PROGRAM ATTENDED:
1-Siemens gas turbine model V 94.3A operation procedures and abnormalities corrective remedies
Country : - Germany.
Company : - SIEMENS PG.
Period : - four Weeks. Started on May 2006
Covered Subjects
4Overview process control system teleperm xp/OM 650
4 Process operation with operating terminals
4 Process monitoring, fault analysis, alarm sequence display
4Process information with curve and bar displays, operating point and logs
4Controller function overview
4Process start- up, operation and shut-down
2-Hitachi steam turbine
Country: Japan
Company: Hitachi,LTD
Period : four week started on Nov. 2007
Covered Subjects
4Synchronous generator maintenance
4Step up transformer maintenance
4Excitation system maintenance
4Protection relay test
B-ON SHORE TRAINING PROGRAMS:
1-protection &control for HV-220 KV. G.I.S switchyard and feeders
Period: four weeks. Started on Dec, 2006
Covered subjects
4 Transmission line protection, bus bar protection, breaker failure protection
4Energy meters, lines recorder.
2-- Electrical maintenance for Siemens gas turbine type V 94.3A
Period : - One Week started on Nov, 2006
Covered Subjects
4 HV transformer protection, generator protection, medium voltage switchgear, Low voltage 400 volt switchgear (Load centre, MCC.), batteries and battery charger.
3-- Operation / mechanical part for gas turbine
Overview GT- packages
KKS system (power plant language)
Equivalent operating hours, formula and its factors for calculations
Start up, loading, and shutdown procedure
4- Operation of Combined Cycle power plant
Place : - Dimata Power station (3x430MW).
Period : - Three Weeks started on Dec, 2004
5- Operation of Combined Cycle power plant
Place : - Nubria Power station (2x750MW combined cycle power plant)
Period : - Five Weeks started on Feb 2002
6- Operation of thermal power plant
Place : - ELKURIMAT I Power station (2x627MW thermal power plant units)
Period : - TEN Weeks started on Feb 2005

IV. WORK EXPERIENCES:
CAREER YEARS - 4 Years
CAREER PROFILE
Around 5 years Involvement in the field of electrical Testing & commissioning
4 Testing & commissioning of Power transformer up to 220kV, 313 MVA and associated its protection.
4 Pre- commissioning of electrical equipments like CT’s, VT’s, SF6 CB (Hydraulic & Spring charge operation), ES and DS, from up to 220kV system, in various substation/ Power plants, Battery chargers.
4Testing & commissioning of Generator and its associated protection.
4 Load test, Sensitivity and stability test for generator and relevant Protections.
4 Protection scheme, Interlocking schemes for generators.
4Testing & Commissioning of Power Transformers, SF6 Circuit breakers, Current Transformers, Voltage Transformers and Distribution Transformers.
4 Testing & Commissioning of control and relay panels for HV, MV switchgear ,LV load centers, 400 V motor control centers , 400/230 panels and 220 and 125 VDC SWGR.

CAREER DETAILS
Company: Upper Egypt Electricity Production Company ( UEEPC)

From Aug 2006 to present
Position: Electrical Testing +Commissioning Engineer
Responsibilities:
Responsible as (UEEPC representative) for commissioning all electrical works in
HV Substation (GIS, 220 kV, breaker &half scheme, 8DN9, Siemens)
Electrical Generator (311MVA, 16.5KV, 0.85 lag P.F, Y-connected, air cooled)
Generator Circuit breaker (16.5KV, 10.5KA, 100KA, ABB),
HV transformer (16.5/240 kV, 180/240/300 MVA, off LTC)
HV transformer (16.5/6.6kV, 32/16/16 MVA, ON LTC)
6.3KV MV Switchgear, and 400 volt LV Switchgear,
Electrical Generator (322 MVA, 18KV, 0.85 lag P.F, Y-connected, hydrogen cooled)
HV transformer (18/240 kV, 284/272/340 MVA, off LTC)
Excitation system ( ABB unitrol 5000 )
Generator control panel
Protection relay panel

From October 2005 to Aug. 2006
Position: Electrical Construction Engineer
Project: El Kureimat II 750 MW Combined Cycle power plant.
Responsibilities:
1- Responsible for "Electrical drawings review and approval"
According to the contract specification requirements
2-Co-ordnation and supervision of all contractors and control
Electrical installation work

From July 2004 to October 2005
Position: Electrical Maintenance Engineer
Project: El Kureimat I 1200 MW thermal Power station Responsibilities:
Generators and Transformers Maintenance.
Switchgear maintenance (MV switchgear, load and LV centers and Motor control centres)